Transgrid signs offer to connect

Transgrid signs offer to connect

Neoen is glad to announce that Transgrid made an offer to connect for stage 1 of  the Griffith Solar Farm, which represents 30MW. This offer was made on June 10th. This is the last step before the signature of a connection agreement and confirms the avalability of sufficent capacity at the connection point as well as the design and cost associated to the connection.

Share this post